WEFTEC 2019 MBR and Aeration Blower True Costs

Aeration Blower True Costs

The exhibition stands and speeches will provide substantial insights into the true costs of aeration blowers. A guide to each relevant exhibit and speech has been prepared. A networking directory to insure the most efficient interface with knowledge sources is also provided. This guide is being continually updated.
WEFTEC 2919 Municipal Wastewater True Cost Guide

In order to facilitate the discussions an extensive analysis Municipal Wastewater Blower True Costs is being made available to attendees. Feel free to submit case histories and comments to add to the analysis.

Important questions are:

  • Which blower type is best fitted for a specific application? high speed turbo, screw compressor, rotary blower, or single stage centrifugal?
  • Choice of magnetic or air foil bearing design
  • Drives, controls
  • Application developments such as nitrification, process control
  • Multiple vs single blower
  • Site specific variables such as electricity cost, flow variation, plant life

To contribute to the analysis and guide contact Bob Mcilvaine 847 226 2391 email: This email address is being protected from spambots. You need JavaScript enabled to view it.

 

WEFTEC Municipal Wastewater Membrane Bioreactor True Cost Guide

The exhibition stands and speeches will provide substantial insights into the true costs of membrane bioreactors and components. A guide to each relevant exhibit and speech has been prepared. A networking directory to insure the most efficient interface with knowledge sources is also provided. This guide is being continually updated To view the contents Click Here

To contribute to this guide contact Bob Mcilvaine 847 226 2391 email: This email address is being protected from spambots. You need JavaScript enabled to view it.

A market report on membrane bioreactors is also available. For Details on the report Click Here                        

The very substantial  body of information from WEFTEC 2018 is shared at 
Municipal Wastewater Treatment Update